Both these projects are built on elevated lines. Line 7 connects Dahisar East with Andheri East. The ticket prices are the same price as mentioned. You can charge the card more than one time if it is not damaged. You can charge from 10 Egyptian pounds to 200 Egyptian pounds from any of the metro stations in all lines. Mumbai Metro Line 2A will run between Dahisar and DN Nagar areas in Mumbai. You can buy a cash wallet with a set of tickets charged in the card (card cost is 25 pounds). Metropolitan Commissioner Srinivas said that work on metro projects in the city is progressing well and two lines, Mumbai Metro Line 2A and Mumbai Metro Line 7, may start operations soon. Alstom has also assured us that they are engaged in other projects all over India and that this cancellation will not be a problem in any other projects. According to officials, two train sets for Line 3 are ready and the third one is under production at factory in Sri City at Andhra Pradesh and they will soon be delivered to Mumbai Metro Rail Corporation Limited (MMRCL). The French company Alstom is currently executing a contract for Mumbai Metro Line 3, which includes a supply of rolling stock, power supply and signaling. As per sources, Alstom was looking forward to strengthening the mobility infrastructure for the citizens of Mumbai and supporting the Make in India initiative. Now MMRDA is looking at alternative options for the depot and according to the sources, they may move it to the Mogharpada area in Thane. MMRDA previously said that this project would reduce the current travel time by 50% to 75%, depending on road conditions. ![]() The main aim of his project is to connect the Eastern Express Roadway, Central Railway, Monorail, the ongoing Metro Line 2B (D N Nagar to Mandale) and the proposed Metro Line 5 (Thane to Kalyan), Metro Line 6 (Swami Samarth Nagar to Vikhroli) & Metro Line 8 (Wadala to General Post Office). Metro Line 4 from Wadala to Kasarvadavali is planned to be a 32.32 km long elevated corridor with 32 stations. But there were delays in handing over land for a car depot and other issues with the project which led Alstom to pull out of the job. They bagged the contract as they were the lowest bidder with a bid of Rs 1,198 crore. Nikolaos Kouretas, CEO and Vice Chairman of the BoD of ATTIKO METRO S.A. ![]() Karamanlis at Katehaki TBM Shaft worksite, of the Athens Metro New Line 4, Section A’ Alsos Veikou Goudi. Mumbai Metropolitan Region Development Authority (MMRDA) awarded the contract to supply 234 coaches or 39 trains for the Metro-4 (Wadala-Thane-Kasarwadavali) and Metro-4A (Kasarwadavali-Gaimukh) to Bombardier Transportation in March 2021 which has been acquired by Alstom. Visit of the Minister of Infrastructures and Transport K. ![]() MUMBAI (Metro Rail News): Alstom has cancelled the contract which the company won for the project of coaches for Mumbai metro’s fourth line and its extension (Mumbai Metro-4 and 4A) due to delays.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |